ESB Ecars · EV charging site
DRD Car Park Shimna Road
Shimna Road, Newcastle, BT33 0AS
DRD Car Park Shimna Road is an EV charging site in Newcastle, Newry Mourne and Down, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Newcastle Centre (EZO (IE)), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Getting there
- DRD Car Park, Shimna Rd, Newcastle
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at DRD Car Park Shimna Road (ESB Ecars)?
Up to 22 kW AC via Type 2.
How many charging sockets does DRD Car Park Shimna Road (ESB Ecars) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates DRD Car Park Shimna Road?
DRD Car Park Shimna Road is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest charger with 50 kW or more to DRD Car Park Shimna Road (ESB Ecars)?
Newcastle Centre (EZO (IE)) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at DRD Car Park Shimna Road (ESB Ecars)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DRD Car Park Shimna Road (ESB Ecars)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at DRD Car Park Shimna Road (ESB Ecars)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Circle K · 100 kW · 0.4 mi