ESB Ecars · EV charging site
The Fir Trees Hotel
Dublin Rd, Strabane, BT82 9EA
The Fir Trees Hotel is an EV charging site in Strabane, Derry City and Strabane, run by ESB Ecars. Its 4 sockets reach up to 100 kW, with CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Lidl, 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Getting there
- The Fir Trees Hotel, Dublin Road,Strabane
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Fir Trees Hotel (ESB Ecars)?
Up to 100 kW DC via Type 2, CCS.
How many charging sockets does The Fir Trees Hotel (ESB Ecars) have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 100 kW CCS.
Who operates The Fir Trees Hotel?
The Fir Trees Hotel is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest other charger with 50 kW or more to The Fir Trees Hotel (ESB Ecars)?
Lidl is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Fir Trees Hotel (ESB Ecars)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Fir Trees Hotel (ESB Ecars)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Fir Trees Hotel (ESB Ecars)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- McDonald's · 120 kW · 1.4 mi