ESB Energy · EV charging site
10-6 Rossmore Road, Westminster
10-6 Rossmore Road, Westminster, London NW1 6PA, UK, Bayswater
10-6 Rossmore Road, Westminster is an EV charging site in Bayswater, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 728 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Harrow road (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 10-6 Rossmore Road, Westminster (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does 10-6 Rossmore Road, Westminster (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates 10-6 Rossmore Road, Westminster?
10-6 Rossmore Road, Westminster is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to 10-6 Rossmore Road, Westminster (ESB Energy)?
Harrow road (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 10-6 Rossmore Road, Westminster (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 10-6 Rossmore Road, Westminster (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 10-6 Rossmore Road, Westminster (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 12 Rossmore Road, Opp. of the community cente
- ubitricity Distributed Energy Systems UK Ltd. 12 Rossmore Road, Opp. The Feathers Marylebon
- ubitricity Distributed Energy Systems UK Ltd. 43 Harewood Avenue
- ubitricity Distributed Energy Systems UK Ltd. 4 Rossmore Road
- ubitricity Distributed Energy Systems UK Ltd. 15 Lilestone Street, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 60 Rossmore Road, Opp.
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 12 Rossmore Road, Opp. of the community cente · 56p per kWh · 5 kW · 10 yd