# 21 Bridge Road · ESB Energy

Web page: https://ampmap.co.uk/charger/esb-energy-21-bridge-road-uk

21 Bridge Road is an EV charging site in Wembley, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 21 Bridge Road, HA9 9AG
- **Area:** Wembley, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.56442, -0.27790

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.29/kWh; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** ESB Energy
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** ESB charger. Contactless payment terminal fitted

## Common questions

### How much does it cost to charge at 21 Bridge Road (ESB Energy)?

The listed price is £0.29/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at 21 Bridge Road (ESB Energy)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does 21 Bridge Road (ESB Energy) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

### Who operates 21 Bridge Road?

21 Bridge Road is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

### How long does a Tesla Model Y Long Range take to charge at 21 Bridge Road (ESB Energy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 21 Bridge Road (ESB Energy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 21 Bridge Road (ESB Energy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wembley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wembley)
- [Cheapest charging in Wembley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wembley/cheapest)
- [ESB Energy chargers](https://ampmap.co.uk/networks/esb-energy)

## Chargers near this site

- [Lycée International de Londres Winston Churchill](https://ampmap.co.uk/charger/lycee-international-de-londres-winston-churchill-uk) - Type 2 7 kW · 54 Forty Lane
- [MFG Shell, Wembley Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-mfg-shell-wembley-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Wembley Park Drive
- [ubitricity Distributed Energy Systems UK Ltd. 23 The Avenue](https://ampmap.co.uk/charger/ubitricity-23-the-avenue-uk) - Ubitricity · Type 2 5 kW · 23 The Avenue · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 34 The Avenue](https://ampmap.co.uk/charger/ubitricity-34-the-avenue-uk) - Ubitricity · Type 2 5 kW · 34 The Avenue · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 32 Forty Avenue, opp.](https://ampmap.co.uk/charger/ubitricity-32-forty-avenue-opp-uk) - Ubitricity · Type 2 5 kW · 32 Forty Avenue, opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 27 Forty Avenue](https://ampmap.co.uk/charger/ubitricity-27-forty-avenue-uk) - Ubitricity · Type 2 5 kW · 27 Forty Avenue · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/esb-energy-21-bridge-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 14 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
