# 26 Stoke Green (Opp. Tick-tock Park) · ESB Energy

Web page: https://ampmap.co.uk/charger/esb-energy-26-stoke-green-opp-tick-tock-park-uk

26 Stoke Green (Opp. Tick-tock Park) is an EV charging site in Coventry, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 26 Stoke Green (Opposite Tick-tock Park), Binley Road, CV3 1AA
- **Area:** Coventry, United Kingdom
- **Coordinates (latitude, longitude):** 52.40597, -1.48330

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

## Site information

- **Operator:** ESB Energy
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How fast is charging at 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy)?

Up to 50 kW DC via CHAdeMO, Type 2.

### How many charging sockets does 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy) have?

3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.

### Who operates 26 Stoke Green (Opp. Tick-tock Park)?

26 Stoke Green (Opp. Tick-tock Park) is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

### How long does a Tesla Model Y Long Range take to charge at 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coventry](https://ampmap.co.uk/chargers/united-kingdom/coventry/coventry)
- [ESB Energy chargers](https://ampmap.co.uk/networks/esb-energy)

## Chargers near this site

- [Corner of Marlborough Road & Binley Road-A · Char.gy](https://ampmap.co.uk/charger/char-gy-corner-of-marlborough-road-and-binley-road-a-uk) - Type 2 22 kW · Corner of Marlborough Road & Binley Road - A
- [46 Stoke Green · Char.gy](https://ampmap.co.uk/charger/char-gy-46-stoke-green-uk) - Type 2 3 kW · 46 Stoke Green
- [Opposite Stoke Coventry Club · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-stoke-coventry-club-uk) - Type 2 3 kW · Opposite Stoke Coventry Club
- [64 Harley Street · Char.gy](https://ampmap.co.uk/charger/char-gy-64-harley-street-uk) - Type 2 4 kW · Harley Street
- [64 Harley Street · Char.gy](https://ampmap.co.uk/charger/char-gy-64-harley-street-2-uk) - Type 2 3 kW · 64 Harley Street
- [Corner of Gresham Street & Kingsway · Char.gy](https://ampmap.co.uk/charger/char-gy-corner-of-gresham-street-and-kingsway-uk) - Type 2 3 kW · Corner of Gresham Street & Kingsway

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/esb-energy-26-stoke-green-opp-tick-tock-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
