ESB Energy · EV charging site
Binley Road (car park)
Binley Road, Coventry
Binley Road (car park) is an EV charging site in Coventry, run by ESB Energy. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 81 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Binley Road,(Opp. No. 12) (ESB Energy), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Price
- £0.29/kWh; other tariffs available(from Open Charge Map, 18 Nov 2019)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Getting there
- Public car park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Binley Road (car park) (ESB Energy)?
The listed price is £0.29/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Binley Road (car park) (ESB Energy)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Binley Road (car park) (ESB Energy) have?
2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS, 2 × 43 kW Type 2.
Who operates Binley Road (car park)?
Binley Road (car park) is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Binley Road (car park) (ESB Energy)?
Binley Road,(Opp. No. 12) (ESB Energy) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Binley Road (car park) (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Binley Road (car park) (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Binley Road (car park) (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.