ESB Energy · EV charging site
Carlisle Lane Parking/Charging
195 Carlisle Lane, Lambeth, City of Westminster, SE17LH
Carlisle Lane Parking/Charging is an EV charging site in City of Westminster, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 272 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Dog House (Chargemaster), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Carlisle Lane Parking/Charging (ESB Energy)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Carlisle Lane Parking/Charging (ESB Energy) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates Carlisle Lane Parking/Charging?
Carlisle Lane Parking/Charging is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Carlisle Lane Parking/Charging (ESB Energy)?
The Dog House (Chargemaster) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Carlisle Lane Parking/Charging (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Carlisle Lane Parking/Charging (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Carlisle Lane Parking/Charging (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.