ESB Energy · EV charging site
ESB Falloden Way
49 Falloden Way, Golders Green, NW11
ESB Falloden Way is an EV charging site in Golders Green, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 38 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 20 The Market Place, Falloden Way (ESB Energy), 120 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Notes
- contactless payment terminal fitted
- Getting there
- on-street marked ev charging bay
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at ESB Falloden Way (ESB Energy)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does ESB Falloden Way (ESB Energy) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates ESB Falloden Way?
ESB Falloden Way is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to ESB Falloden Way (ESB Energy)?
20 The Market Place, Falloden Way (ESB Energy) is 120 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ESB Falloden Way (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ESB Falloden Way (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ESB Falloden Way (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 20 The Market Place, Falloden Way
- ubitricity Distributed Energy Systems UK Ltd. 27 Ossulton Way
- ubitricity Distributed Energy Systems UK Ltd. 24 Brim Hill
- ubitricity Distributed Energy Systems UK Ltd. 46 Gurney Drive
- ubitricity Distributed Energy Systems UK Ltd. 50 Northway
- ubitricity Distributed Energy Systems UK Ltd. 30 Oakwood Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 27 Ossulton Way · 57p per kWh · 5 kW · 0.1 mi