# Foleshill Road · ESB Energy

Web page: https://ampmap.co.uk/charger/esb-energy-foleshill-road-uk

Foleshill Road is an EV charging site in Coventry, run by ESB Energy. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.29/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Foleshill Road, CV6 5JR
- **Area:** Coventry, United Kingdom
- **Coordinates (latitude, longitude):** 52.43087, -1.49750

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** ESB Energy
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Foleshill Road (ESB Energy)?

The listed price is £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Foleshill Road (ESB Energy)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Foleshill Road (ESB Energy) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

### Who operates Foleshill Road?

Foleshill Road is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

### How long does a Tesla Model Y Long Range take to charge at Foleshill Road (ESB Energy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Foleshill Road (ESB Energy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Foleshill Road (ESB Energy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coventry](https://ampmap.co.uk/chargers/united-kingdom/coventry/coventry)
- [ESB Energy chargers](https://ampmap.co.uk/networks/esb-energy)

## Chargers near this site

- [Foleshill Road (Opp. 625) · ESB Energy](https://ampmap.co.uk/charger/esb-energy-foleshill-road-opp-625-uk) - CHAdeMO 50 kW, Type 2 50 kW · Foleshill Road (Opposite 625)
- [Foleshill Road 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-foleshill-road-1-uk) - Type 2 7 kW · Foleshill Road
- [Ransom Road 2 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-ransom-road-2-uk) - Type 2 7 kW · Ransom Road
- [Eld Road 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-eld-road-1-uk) - Type 2 7 kW · Eld Road
- [Carpark Adjacent to 9 Holmsdale Road-A · Char.gy](https://ampmap.co.uk/charger/char-gy-carpark-adjacent-to-9-holmsdale-road-a-uk) - Type 2 7 kW · Carpark Adjacent to 9 Holmsdale Road - A
- [Station Street West](https://ampmap.co.uk/charger/9000143-uk) - Type 2 22 kW

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/esb-energy-foleshill-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 18 Nov 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
