ESB Energy · EV charging site
Gloucester Way, Clerkenwell
Gloucester Way, Islington, EC1R 1YJ
Gloucester Way, Clerkenwell is an EV charging site in Islington, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 165 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 17 Meredith Street (ESB Energy), 130 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- ESB: PAYG 29p per kWh, or 25p per kWh with membership (£4 per month)(from Open Charge Map, 19 Oct 2020)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Gloucester Way, Clerkenwell (ESB Energy)?
The listed price is ESB: PAYG 29p per kWh, or 25p per kWh with membership (£4 per month). Prices can change, so check the price at the charger before you start.
How fast is charging at Gloucester Way, Clerkenwell (ESB Energy)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Gloucester Way, Clerkenwell (ESB Energy) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates Gloucester Way, Clerkenwell?
Gloucester Way, Clerkenwell is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Gloucester Way, Clerkenwell (ESB Energy)?
17 Meredith Street (ESB Energy) is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Gloucester Way, Clerkenwell (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gloucester Way, Clerkenwell (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Gloucester Way, Clerkenwell (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 17 Meredith Street
- Saint John Street 327
- ubitricity Distributed Energy Systems UK Ltd. 9 Hardwick Street, opp The Remus Building
- ubitricity Distributed Energy Systems UK Ltd. 10 Wyclif Street
- ubitricity Distributed Energy Systems UK Ltd. 35 Wyclif Street
- ubitricity Distributed Energy Systems UK Ltd. 6 Spencer Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 9 Hardwick Street, opp The Remus Building · 45p per kWh · 5 kW · 160 yd