# Godstone Road Station · ESB Energy

Web page: https://ampmap.co.uk/charger/esb-energy-godstone-road-station-uk

Godstone Road Station is an EV charging site in Purley, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.25/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 302 Godstone Road, CR8 5BG
- **Area:** Purley, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.32016, -0.08968

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.25/kWh (from Open Charge Map)

## Site information

- **Operator:** ESB Energy
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Godstone Road Station (ESB Energy)?

The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Godstone Road Station (ESB Energy)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Godstone Road Station (ESB Energy) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

### Who operates Godstone Road Station?

Godstone Road Station is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

### How long does a Tesla Model Y Long Range take to charge at Godstone Road Station (ESB Energy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Godstone Road Station (ESB Energy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Godstone Road Station (ESB Energy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Purley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/purley)
- [ESB Energy chargers](https://ampmap.co.uk/networks/esb-energy)

## Chargers near this site

- [302 Godstone Rd, Kenley · ESB Energy](https://ampmap.co.uk/charger/esb-energy-302-godstone-rd-kenley-uk) - CHAdeMO 50 kW, Type 2 50 kW · 302 Godstone Rd Kenley, Kenley
- [72-74 Godstone Road](https://ampmap.co.uk/charger/72-74-godstone-road-uk) - CCS 50 kW, CHAdeMO 50 kW
- [40 Godstone Road](https://ampmap.co.uk/charger/40-godstone-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Godstone Road
- [Wattenden Arms · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-old-lodge-lane-uk) - CCS / CHAdeMO 50 kW · Wattenden Arms, Old Lodge Lane · From 89p/kWh
- [Lower Road · Believ](https://ampmap.co.uk/charger/believ-lower-road-uk) - Type 2 7 kW · Lower Road
- [Shell Recharge Shell Little Waitrose Whyteleafe](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-whyteleafe-uk) - CCS / CHAdeMO 50 kW · 408 Godstone Rd · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/esb-energy-godstone-road-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Jun 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
