ESB Energy · EV charging site
Hainault LU Station Car Park
Hainault LU Station Car Park, New North Road, Woodford Green, IG6 3BD
Hainault LU Station Car Park is an EV charging site in Woodford Green, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 28 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Hainault Underground Station - Taxi Charger (ESB Energy), 140 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hainault LU Station Car Park (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Hainault LU Station Car Park (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Hainault LU Station Car Park?
Hainault LU Station Car Park is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Hainault LU Station Car Park (ESB Energy)?
Hainault Underground Station - Taxi Charger (ESB Energy) is 140 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hainault LU Station Car Park (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hainault LU Station Car Park (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hainault LU Station Car Park (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hainault Underground Station - Taxi Charger
- ubitricity Distributed Energy Systems UK Ltd. Davids way 6
- ubitricity Distributed Energy Systems UK Ltd. 34 Walden way opp junction of Davids way
- ubitricity Distributed Energy Systems UK Ltd. 1 Robinia Close
- ubitricity Distributed Energy Systems UK Ltd. Vincent close 25
- ubitricity Distributed Energy Systems UK Ltd. 16 The Holt
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Davids way 6 · 45p per kWh · 5 kW · 150 yd