ESB Energy · EV charging site
Holbrook Lane (Opp. 178)
Holbrook Lane (Opposite 178), Coventry, CV6 4BY
Holbrook Lane (Opp. 178) is an EV charging site in Coventry, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 71 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 341 Holbrook Lane (ESB Energy), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Holbrook Lane (Opp. 178) (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Holbrook Lane (Opp. 178) (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Holbrook Lane (Opp. 178)?
Holbrook Lane (Opp. 178) is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Holbrook Lane (Opp. 178) (ESB Energy)?
341 Holbrook Lane (ESB Energy) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Holbrook Lane (Opp. 178) (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Holbrook Lane (Opp. 178) (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Holbrook Lane (Opp. 178) (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.