ESB Energy · EV charging site
Hounslow-West Station Car Park
Hounslow-West Station Car Park,Bath Road, Hounslow, Heston, TW3 3DH
Hounslow-West Station Car Park is an EV charging site in Heston, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 40 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Cranford SF Connect (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hounslow-West Station Car Park (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Hounslow-West Station Car Park (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Hounslow-West Station Car Park?
Hounslow-West Station Car Park is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Hounslow-West Station Car Park (ESB Energy)?
Cranford SF Connect (BP Pulse) is 0.5 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hounslow-West Station Car Park (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hounslow-West Station Car Park (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hounslow-West Station Car Park (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- NCP Hounslow West Station
- Bath Road
- ubitricity Distributed Energy Systems UK Ltd. 22 Standard Road, Outside 22
- Standard Road
- Vicarage Farm Road Site 2
- Standard Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 22 Standard Road, Outside 22 · 45p per kWh · 5 kW · 0.3 mi