ESB Energy · EV charging site
Kensington Road,Kensington
Kensington Road, Kensington, Bayswater, SW7 5DP
Kensington Road,Kensington is an EV charging site in Bayswater, Greater London, run by ESB Energy. Both of its sockets are 50 kW CHAdeMO and Type 2. 462 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lancaster Gate (Spire House), Bayswater (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Kensington Road,Kensington (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Kensington Road,Kensington (ESB Energy) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Kensington Road,Kensington?
Kensington Road,Kensington is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Kensington Road,Kensington (ESB Energy)?
Lancaster Gate (Spire House), Bayswater (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kensington Road,Kensington (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kensington Road,Kensington (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kensington Road,Kensington (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 3 De Vere Gardens
- De Vere Gardens
- ubitricity Distributed Energy Systems UK Ltd. 14 De Vere Gardens
- ubitricity Distributed Energy Systems UK Ltd. 23 Palace Gate
- ubitricity Distributed Energy Systems UK Ltd. 5A Victoria Road
- ubitricity Distributed Energy Systems UK Ltd. 29 Palace Gate
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 3 De Vere Gardens · 45p per kWh · 5 kW · 110 yd