ESB Energy · EV charging site
Lands End Way
Lands End Way, Melton Mowbray, LE15 6RB
Lands End Way is an EV charging site in Melton Mowbray, Leicestershire, run by ESB Energy. Both of its sockets are 300 kW CCS, and the price is listed as £0.77/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is InstaVolt McDonald's Oakham (InstaVolt Ltd), 80 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.77/kWh(from Open Charge Map, 29 Feb 2024)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lands End Way (ESB Energy)?
The listed price is £0.77/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Lands End Way (ESB Energy)?
Up to 300 kW DC via CCS.
How many charging sockets does Lands End Way (ESB Energy) have?
2 charging sockets: 1 × 300 kW CCS, 1 × 300 kW CCS, 1 × 300 kW CCS, 1 × 300 kW CCS.
Who operates Lands End Way?
Lands End Way is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Lands End Way (ESB Energy)?
InstaVolt McDonald's Oakham (InstaVolt Ltd) is 80 yards away in a straight line, with up to 62 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lands End Way (ESB Energy)?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lands End Way (ESB Energy)?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lands End Way (ESB Energy)?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- InstaVolt McDonald's Oakham
- Pod Point Oakham Town Council - Church Street Car Park
- Pod Point Tesco Superstore - Oakham
- Mick Appleby Racing & Breading
- Cheapest nearby
- Pod Point Tesco Superstore - Oakham · 44.4p per kWh · 7 kW · 0.9 mi