ESB Energy · EV charging site
Limburg Road, A3 Battersea Rise
Limburg Road, A3 Battersea Rise, Clapham, Latchmere, SW11 1EQ
Limburg Road, A3 Battersea Rise is an EV charging site in Latchmere, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 177 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Clapham Common North Side (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Limburg Road, A3 Battersea Rise (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Limburg Road, A3 Battersea Rise (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Limburg Road, A3 Battersea Rise?
Limburg Road, A3 Battersea Rise is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Limburg Road, A3 Battersea Rise (ESB Energy)?
Clapham Common North Side (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Limburg Road, A3 Battersea Rise (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Limburg Road, A3 Battersea Rise (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Limburg Road, A3 Battersea Rise (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 52 Shelgate Road, Opp., Junc. Lindore Road
- ubitricity Distributed Energy Systems UK Ltd. 28 Comyn Road London England SW11 1QD GB
- ubitricity Distributed Energy Systems UK Ltd. 16 Webb's Road England SW11 1XJ United Kingdo
- ubitricity Distributed Energy Systems UK Ltd. opp 49 Comyn Road London
- Comyn Road
- ubitricity Distributed Energy Systems UK Ltd. 19A Leathwaite Road England SW11 1XG United K
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 52 Shelgate Road, Opp., Junc. Lindore Road · 45p per kWh · 5 kW · 0.1 mi