ESB Energy · EV charging site
Lockhurst Lane
Lockhurst Lane, Coventry, CV6 5NY
Lockhurst Lane is an EV charging site in Coventry, run by ESB Energy. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.29/kWh. 61 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Foleshill Road (ESB Energy), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.29/kWh(from Open Charge Map, 18 Nov 2019)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lockhurst Lane (ESB Energy)?
The listed price is £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Lockhurst Lane (ESB Energy)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Lockhurst Lane (ESB Energy) have?
2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS, 2 × 43 kW Type 2.
Who operates Lockhurst Lane?
Lockhurst Lane is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Lockhurst Lane (ESB Energy)?
Foleshill Road (ESB Energy) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lockhurst Lane (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lockhurst Lane (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lockhurst Lane (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.