# Oakwood Station NCP Car Park · ESB Energy

Web page: https://ampmap.co.uk/charger/esb-energy-oakwood-station-ncp-car-park-uk

Oakwood Station NCP Car Park is an EV charging site in East Barnet, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.45/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 119 Bramley Road, N14 4UT
- **Area:** East Barnet, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.64780, -0.13095

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |

- **Price:** £0.45/kWh (from Open Charge Map)

## Site information

- **Operator:** ESB Energy
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Oakwood Station NCP Car Park (ESB Energy)?

The listed price is £0.45/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Oakwood Station NCP Car Park (ESB Energy)?

Up to 50 kW DC via CHAdeMO, CCS.

### How many charging sockets does Oakwood Station NCP Car Park (ESB Energy) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Oakwood Station NCP Car Park?

Oakwood Station NCP Car Park is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

### How long does a Tesla Model Y Long Range take to charge at Oakwood Station NCP Car Park (ESB Energy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oakwood Station NCP Car Park (ESB Energy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Oakwood Station NCP Car Park (ESB Energy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in East Barnet](https://ampmap.co.uk/chargers/united-kingdom/greater-london/east-barnet)
- [ESB Energy chargers](https://ampmap.co.uk/networks/esb-energy)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 44 Chase Road, opp.](https://ampmap.co.uk/charger/ubitricity-44-chase-road-opp-uk) - Ubitricity · Type 2 5 kW · 44 Chase Road, opp. · From 45p/kWh
- [50 Cockfosters Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-50-cockfosters-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Enfield
- [Cockfosters Road · Total Energies](https://ampmap.co.uk/charger/total-energies-cockfosters-road-uk) - Type 2 7 kW · Cockfosters Road
- [Cockfosters SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-cockfosters-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · Cockfosters Road
- [MFG Southgate · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-southgate-uk) - CCS 150 kW, CHAdeMO 50 kW · 99 Chase Side
- [M&S Southgate · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-m-and-s-southgate-uk) - CCS 50 kW, CHAdeMO 50 kW · 21 Winchmore Hill Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/esb-energy-oakwood-station-ncp-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 31 May 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
