ESB Energy · EV charging site
On-street
Margaret Street, Birmingham, B3 3BX
On-street is an EV charging site in Birmingham, City and Borough of Birmingham, run by ESB Energy. Both of its sockets are 22 kW Type 2, and charging is listed as free. 33 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Brunel Street Car Park Birmingham (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 24 Aug 2021)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Getting there
- On-street. On corner of Margaret Street and Edmund Street. Fitted under Midlands PiP
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at On-street (ESB Energy)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at On-street (ESB Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does On-street (ESB Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates On-street?
On-street is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest charger with 50 kW or more to On-street (ESB Energy)?
Brunel Street Car Park Birmingham (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at On-street (ESB Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at On-street (ESB Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at On-street (ESB Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Landrow Place
- Temple Row
- Brindley Drive Car Park Birmingham - 70524
- Temple Row Birmingham - 70530
- Brunel Street Car Park Birmingham
- Livery Street Car Park Birmingham - 70520
- Cheapest nearby
- Pod Point Landrow Place · 39.6p per kWh · 7 kW · 0.1 mi
- Fastest nearby
- Brunel Street Car Park Birmingham · 50 kW · 0.2 mi