ESB Energy · EV charging site
Rowan Road (Opp no. 5)
Rowan Road (Opp no. 5), Hammersmith, Shepherds Bush, W6 7DT
Rowan Road (Opp no. 5) is an EV charging site in Shepherds Bush, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 1,524 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is bp Hammersmith Flyover (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Rowan Road (Opp no. 5) (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Rowan Road (Opp no. 5) (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Rowan Road (Opp no. 5)?
Rowan Road (Opp no. 5) is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Rowan Road (Opp no. 5) (ESB Energy)?
bp Hammersmith Flyover (BP Pulse) is 0.2 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rowan Road (Opp no. 5) (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rowan Road (Opp no. 5) (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rowan Road (Opp no. 5) (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Rowan Road
- ubitricity Distributed Energy Systems UK Ltd. 23 Rowan Road, Outside 23
- Wolverton Gardens
- ubitricity Distributed Energy Systems UK Ltd. Gardens Bute, Jnc With Rowan Road
- Bute Gardens
- ubitricity Distributed Energy Systems UK Ltd. 44A Wolverton Gardens, Side Of 44A Bute Garde
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 23 Rowan Road, Outside 23 · 45p per kWh · 5 kW · 70 yd