ESB Energy · EV charging site
South Woodford LU
George Lane - Redbridge, Woodford Green, E18 1JJ
South Woodford LU is an EV charging site in Woodford Green, Greater London, run by ESB Energy. Both of its sockets are 50 kW CHAdeMO and Type 2. 116 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Derby Road Car Park (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at South Woodford LU (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does South Woodford LU (ESB Energy) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates South Woodford LU?
South Woodford LU is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to South Woodford LU (ESB Energy)?
Derby Road Car Park (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at South Woodford LU (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Woodford LU (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at South Woodford LU (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 39 George Lane
- 21 Mulberry Way
- 18 Pelham Road
- ubitricity Distributed Energy Systems UK Ltd. 36 Pelham road
- Orford Road
- Marlborough Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 36 Pelham road · 45p per kWh · 5 kW · 0.1 mi