# Stamford Hill · ESB Energy

Web page: https://ampmap.co.uk/charger/esb-energy-stamford-hill-uk

Stamford Hill is an EV charging site in Stamford Hill, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.29/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 88 Stamford Hill, N16 5AY
- **Area:** Stamford Hill, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.56725, -0.07290

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** ESB Energy
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** TfL funded rapid charger

## Common questions

### How much does it cost to charge at Stamford Hill (ESB Energy)?

The listed price is £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stamford Hill (ESB Energy)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Stamford Hill (ESB Energy) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

### Who operates Stamford Hill?

Stamford Hill is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

### How long does a Tesla Model Y Long Range take to charge at Stamford Hill (ESB Energy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stamford Hill (ESB Energy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stamford Hill (ESB Energy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stamford Hill](https://ampmap.co.uk/chargers/united-kingdom/greater-london/stamford-hill)
- [ESB Energy chargers](https://ampmap.co.uk/networks/esb-energy)

## Chargers near this site

- [Glyn Hopkin North London-Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-glyn-hopkin-north-london-nissan-uk) - CHAdeMO 50 kW, Type 2 7 kW · 49-51 Stamford Hill
- [MFG BP Stamford Hill · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-mfg-bp-stamford-hill-uk) - CCS 50 kW, CHAdeMO 50 kW · 43-45 Stamford Hill
- [Garnham Close · Total Energies](https://ampmap.co.uk/charger/total-energies-garnham-close-uk) - Type 2 7 kW, J-1772 4 kW · Garnham Close
- [Outside 150-154 Stamford Hill · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-150-154-stamford-hill-uk) - CCS 50 kW · Stoke Newington
- [Oldhill Street · Total Energies](https://ampmap.co.uk/charger/total-energies-oldhill-street-uk) - Type 2 7 kW, J-1772 4 kW · Oldhill Street
- [Yoakley Road · Total Energies](https://ampmap.co.uk/charger/total-energies-yoakley-road-uk) - Type 2 7 kW, J-1772 4 kW · Yoakley Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/esb-energy-stamford-hill-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Jun 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
