ESB Energy · EV charging site
Wanstead London Underground Station
Wanstead London Underground Station,The Greeen, Wanstead, Leytonstone, E11 2NT
Wanstead London Underground Station is an EV charging site in Leytonstone, Greater London, run by ESB Energy. Both of its sockets are 50 kW CHAdeMO and Type 2. 138 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Toby Carvery Snaresbrook (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Wanstead London Underground Station (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Wanstead London Underground Station (ESB Energy) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Wanstead London Underground Station?
Wanstead London Underground Station is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Wanstead London Underground Station (ESB Energy)?
Toby Carvery Snaresbrook (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wanstead London Underground Station (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wanstead London Underground Station (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wanstead London Underground Station (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chester Road
- 36 Chester Road
- 22 Oak Hall Road
- 13 Redbridge Lane West
- Wanstead Library
- ubitricity Distributed Energy Systems UK Ltd. Addison Road, outside church
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Addison Road, outside church · 56p per kWh · 5 kW · 0.2 mi