Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Esso Gateway

Aire Valley Drive, Leeds, LS9 0AA

Esso Gateway is an EV charging site in Leeds, City and Borough of Leeds. Its 6 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.69/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Leeds Skelton Lakes, 0.5 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 19 Jul 2026Last verified 19 Jul 2026

Connectors

CCS · 150 kW6 connectors
CHAdeMO · 50 kW3 connectors

Site information

Opening hours
Not published
Access
Public
Price
£0.69/kWh(from Open Charge Map, 19 Jul 2026)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Esso Gateway?

The listed price is £0.69/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Esso Gateway?

Up to 150 kW DC via CHAdeMO, CCS.

How many charging sockets does Esso Gateway have?

6 charging sockets: 3 × 50 kW CHAdeMO, 6 × 150 kW CCS.

Where is the nearest other charger with 50 kW or more to Esso Gateway?

IONITY GmbH IONITY Leeds Skelton Lakes is 0.5 miles away in a straight line, with up to 400 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Esso Gateway?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Esso Gateway?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Esso Gateway?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 19 Jul 2026

Amp Map does not take payment. You pay the operator.