Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV Moy · EV charging site

EV Moy

45 Charlemont Street, Portadown, BT71 7SL

EV Moy is an EV charging site in Portadown, Armagh City Banbridge and Craigavon, run by EV Moy and open 24 hours a day. Both of its sockets are 75 kW CCS. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 29 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Maxol (ESB Ecars), 3.7 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from EV Moy’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors2 free
ULTRA0075-A99% reliabilityAvailable
ULTRA0075-B99% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
EV Moy
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the operator's appRFID card
Charger ID
ULTRA0075-A

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at EV Moy?

Up to 75 kW DC via CCS.

How many charging sockets does EV Moy have?

2 charging sockets: 2 × 75 kW CCS. Live per-socket availability is shown on this page.

Is EV Moy open 24/7?

Yes - EV Moy is open 24 hours a day, 7 days a week.

When is EV Moy busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is EV Moy?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 29 observed charging sessions.

Who operates EV Moy?

EV Moy is on the EV Moy network.

Where is the nearest other charger with 50 kW or more to EV Moy?

Maxol (ESB Ecars) is 3.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EV Moy?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EV Moy?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EV Moy?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: EV Moy · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.