# EV Moy

Web page: https://ampmap.co.uk/charger/ev-moy-uk

EV Moy is an EV charging site in Portadown, Armagh City Banbridge and Craigavon, run by EV Moy and open 24 hours a day. Both of its sockets are 75 kW CCS. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 27 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 13:06 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 45 Charlemont Street, BT71 7SL
- **Area:** Portadown, Armagh City Banbridge and Craigavon, United Kingdom
- **Coordinates (latitude, longitude):** 54.44522, -6.68882

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 75 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** EV Moy
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the operator's app; RFID card

## Common questions

### How fast is charging at EV Moy?

Up to 75 kW DC via CCS.

### How many charging sockets does EV Moy have?

2 charging sockets: 2 × 75 kW CCS. Live per-socket availability is shown on this page.

### Is EV Moy open 24/7?

Yes - EV Moy is open 24 hours a day, 7 days a week.

### When is EV Moy busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.

### How reliable is EV Moy?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 27 observed charging sessions.

### Who operates EV Moy?

EV Moy is on the EV Moy network.

### How long does a Tesla Model Y Long Range take to charge at EV Moy?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EV Moy?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EV Moy?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Portadown](https://ampmap.co.uk/chargers/united-kingdom/armagh-city-banbridge-and-craigavon/portadown)

## Chargers near this site

- [Bernburb Priory · EZO (IE)](https://ampmap.co.uk/charger/ezo-bernburb-priory-uk) - Type 2 22 kW · 10 Main St
- [Maxol · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-maxol-uk) - CCS 50 kW, CHAdeMO 50 kW · 57 Moy Rd
- [Saltmarine Dungannon-Hyundai](https://ampmap.co.uk/charger/saltmarine-dungannon-hyundai-uk) - Type 2 7 kW · Junction 14
- [Dungannon, UK · Tesla](https://ampmap.co.uk/charger/tesla-dungannon-supercharger-uk) - CCS 250 kW · The Linen Green, Main Rd · From 25p/kWh
- [Peatland Park Dungannon · Weev](https://ampmap.co.uk/charger/weev-peatland-park-dungannon-uk) - Type 2 7 kW · 33 Derryhubbert Road
- [HRL Ranfurly · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-hrl-ranfurly-uk) - CCS 150 kW · 20 Moy Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ev-moy-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: EV Moy (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
