# EV-OG

Web page: https://ampmap.co.uk/charger/ev-og-uk

EV-OG is an EV charging site in Kingswinford, Dudley, run by EV-OG and open 24 hours a day. Both of its sockets are 360 kW CCS.

## Status

Offline at 22 Nov 2026, 13:00 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Unit 1, Gatehouse Retail Park, Dudley Rd,, DY6 7BJ
- **Area:** Kingswinford, Dudley, United Kingdom
- **Coordinates (latitude, longitude):** 52.50088, -2.15131
- **Getting there:** Drive via Papa Johns Access way

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 360 kW | 2 | Not listed | Status unknown |

## Site information

- **Operator:** EV-OG
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the operator's app; RFID card

## Common questions

### How fast is charging at EV-OG?

Up to 360 kW DC via CCS.

### How many charging sockets does EV-OG have?

2 charging sockets: 2 × 360 kW CCS. Live per-socket availability is shown on this page.

### Is EV-OG open 24/7?

Yes - EV-OG is open 24 hours a day, 7 days a week.

### Who operates EV-OG?

EV-OG is on the EV-OG network.

### How long does a Tesla Model Y Long Range take to charge at EV-OG?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EV-OG?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EV-OG?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kingswinford](https://ampmap.co.uk/chargers/united-kingdom/dudley/kingswinford)

## Chargers near this site

- [Gatehouse G.H. Pensnett · ChargePoint](https://ampmap.co.uk/charger/chargepoint-gatehouse-g-h-pensnett-uk) - Type 2 22 kW · 1876 Second Ave
- [Costa Coffee Drive through · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-costa-coffee-drive-through-uk) - CCS 50 kW · Costa Coffee Drive through, Dudley Road · From 89p/kWh
- [Pensnett Trading Estate · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-pensnett-trading-estate-uk) - CCS 120 kW, CHAdeMO 100 kW · Stallings Lane
- [British Oak Kingswinford, Kingswinford · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-british-oak-uk) - CCS 75 kW, CHAdeMO 50 kW · Stalling's Lane · From 89p/kWh
- [Pod Point Brindley Garages Group](https://ampmap.co.uk/charger/pod-point-brindley-garages-group-uk) - Type 2 22 kW · West Street · From 200.4p/kWh
- [Oak Park · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-oak-park-uk) - CCS 120 kW · Oak Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ev-og-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: EV-OG (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
