EVBox · EV charging site
Lidget Street Car Park
Lidget Street, Huddersfield, HD3 3JB
Lidget Street Car Park is an EV charging site in Huddersfield, Kirklees, run by EVBox. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as Free to charge. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Able Fuels Huddersfield, 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EVBox
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- Free to charge(from Open Charge Map, 9 Oct 2020)
- Notes
- Engie rapid charger, 50kW DC / 22kW AC Both free to charge but need to register at ev.engie.co.uk £10 overstay fee after 75mins, then £10 every subsequent 75mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidget Street Car Park (EVBox)?
The listed price is Free to charge. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidget Street Car Park (EVBox)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Lidget Street Car Park (EVBox) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Lidget Street Car Park?
Lidget Street Car Park is on the EVBox network.
Where is the nearest other charger with 50 kW or more to Lidget Street Car Park (EVBox)?
Able Fuels Huddersfield is 1.5 miles away in a straight line, with up to 80 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidget Street Car Park (EVBox)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidget Street Car Park (EVBox)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidget Street Car Park (EVBox)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Huddersfield Royal Infirmary - Acre Mills Outpatient
- Able Fuels Huddersfield
- Cambridge Hotel
- Bath Street Car Park
- Henry Street
- Genie
- Fastest nearby
- Henry Street · 120 kW · 1.8 mi