# Stone House Hotel · EVBox

Web page: https://ampmap.co.uk/charger/evbox-stone-house-hotel-uk

Stone House Hotel is an EV charging site in Kirkby Stephen, Cumbria, run by EVBox. Both of its sockets are 4 kW Type 2, and the price is listed as from £1.75 per hour.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Sedbusk, DL8 3PT
- **Area:** Kirkby Stephen, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.31619, -2.18775
- **Getting there:** Please follow signs for Stone House Hotel (half a mile from Hawes).

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 2 | Not listed |

- **Price:** from £1.75 per hour (from Open Charge Map)

## Site information

- **Operator:** EVBox
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Please go to hotel reception to purchase charging tokens (2 hours per token - max 8 hours). Reception open daily 8am to 10pm. Discounts available for hotel guests.

## Common questions

### How much does it cost to charge at Stone House Hotel (EVBox)?

The listed price is from £1.75 per hour. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stone House Hotel (EVBox)?

Up to 4 kW AC via Type 2.

### How many charging sockets does Stone House Hotel (EVBox) have?

2 charging sockets: 2 × 4 kW Type 2.

### Who operates Stone House Hotel?

Stone House Hotel is on the EVBox network. For site issues, the operator lists 01969667571.

### How long does a Tesla Model Y Long Range take to charge at Stone House Hotel (EVBox)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stone House Hotel (EVBox)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stone House Hotel (EVBox)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kirkby Stephen](https://ampmap.co.uk/chargers/united-kingdom/cumbria/kirkby-stephen)
- [EVBox chargers](https://ampmap.co.uk/networks/evbox)

## Chargers near this site

- [Pod Point Hawes National Park Centre](https://ampmap.co.uk/charger/pod-point-hawes-national-park-centre-uk) - Type 2 7 kW · Burtersett Rd Hawes · From 62.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evbox-stone-house-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 14 Jun 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
