# Cambrian Coast caravan park · evcharge.online

Web page: https://ampmap.co.uk/charger/evcharge-online-cambrian-coast-caravan-park-uk

Cambrian Coast caravan park is an EV charging site in Aberystwyth, County of Ceredigion, run by evcharge.online. Both of its sockets are 7 kW CCS, and the price is listed as 25p per kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Borth
- **Area:** Aberystwyth, County of Ceredigion, United Kingdom
- **Coordinates (latitude, longitude):** 52.50959, -4.05011

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 7 kW | 1 | Not listed |

- **Price:** 25p per kW (from Open Charge Map)

## Site information

- **Operator:** evcharge.online
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** first rate site with good facilities

## Common questions

### How much does it cost to charge at Cambrian Coast caravan park (evcharge.online)?

The listed price is 25p per kW. Prices can change, so check the price at the charger before you start.

### How fast is charging at Cambrian Coast caravan park (evcharge.online)?

Up to 7 kW AC via CCS.

### How many charging sockets does Cambrian Coast caravan park (evcharge.online) have?

2 charging sockets: 1 × 7 kW CCS.

### Who operates Cambrian Coast caravan park?

Cambrian Coast caravan park is on the evcharge.online network.

### How long does a Tesla Model Y Long Range take to charge at Cambrian Coast caravan park (evcharge.online)?

A 10–80% charge takes about 7h 54m on the 7 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cambrian Coast caravan park (evcharge.online)?

A 10–80% charge takes about 5h 42m on the 7 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Cambrian Coast caravan park (evcharge.online)?

A 10–80% charge takes about 7h 18m on the 7 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aberystwyth](https://ampmap.co.uk/chargers/united-kingdom/county-of-ceredigion/aberystwyth)
- [evcharge.online chargers](https://ampmap.co.uk/networks/evcharge-online)

## Chargers near this site

- [Borth Community Hall · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-borth-community-hall-uk) - Type 2 22 kW · High Street
- [Pod Point Penrhos Caravan Park](https://ampmap.co.uk/charger/pod-point-penrhos-caravan-park-uk) - Type 2 7 kW · Aberdyfi · From 75.6p/kWh
- [Aberdyfi Main Carpark · Evolt](https://ampmap.co.uk/charger/evolt-network-aberdyfi-main-carpark-uk) - Type 2 22 kW · A493
- [Pod Point Trefeddian Hotel](https://ampmap.co.uk/charger/pod-point-trefeddian-hotel-2-uk) - Type 2 7 kW · Tywyn Road · From 64.8p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evcharge-online-cambrian-coast-caravan-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Jun 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
