evcharge.online · EV charging site
Dinlle Caravan Park
Dinas Dinlle, Llanwnda, LL54 5TW
Dinlle Caravan Park is an EV charging site in Llanwnda, Gwynedd, run by evcharge.online. Both of its sockets are 7 kW Type 2, and the price is listed as £0.26/kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Caernarfon (GeniePoint), 4.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Price
- £0.26/kWh(from Open Charge Map, 16 Apr 2021)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Dinlle Caravan Park (evcharge.online)?
The listed price is £0.26/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Dinlle Caravan Park (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Dinlle Caravan Park (evcharge.online) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Dinlle Caravan Park?
Dinlle Caravan Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Dinlle Caravan Park (evcharge.online)?
Morrisons Caernarfon (GeniePoint) is 4.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dinlle Caravan Park (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dinlle Caravan Park (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dinlle Caravan Park (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.