evcharge.online · EV charging site
Goose Hill Car Park
Goose Hill, Bedlington, NE61 1TL
Goose Hill Car Park is an EV charging site in Bedlington, Northumberland, run by evcharge.online. All 6 of its sockets are 7 kW Type 2, and the price is listed as £0.57/kWh. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Stanley Terrace (Charge Your Car), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Price
- £0.57/kWh(from Open Charge Map, 8 Jun 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Goose Hill Car Park (evcharge.online)?
The listed price is £0.57/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Goose Hill Car Park (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Goose Hill Car Park (evcharge.online) have?
6 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Goose Hill Car Park?
Goose Hill Car Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Goose Hill Car Park (evcharge.online)?
Stanley Terrace (Charge Your Car) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Goose Hill Car Park (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Goose Hill Car Park (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Goose Hill Car Park (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stanley Terrace
- Newmarket Car Park
- Morrisons Morpeth
- Coopies Lane Morpeth
- Morpeth Railway Station (South) Car Park
- St James
- Fastest nearby
- Stanley Terrace · 50 kW · 0.2 mi