evcharge.online · EV charging site
Mermaid Car Park Blyth
Links Road, Blyth, NE24 3PL
Mermaid Car Park Blyth is an EV charging site in Blyth, Northumberland, run by evcharge.online. All 4 of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Keel Row (Fastned), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.57per kWh: Payment through EVCharge.Online mobile website.(from Open Charge Map, 24 Jul 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Mermaid Car Park Blyth (evcharge.online)?
The listed price is £0.57per kWh: Payment through EVCharge.Online mobile website.. Prices can change, so check the price at the charger before you start.
How fast is charging at Mermaid Car Park Blyth (evcharge.online)?
Up to 22 kW AC via Type 2.
How many charging sockets does Mermaid Car Park Blyth (evcharge.online) have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Mermaid Car Park Blyth?
Mermaid Car Park Blyth is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Mermaid Car Park Blyth (evcharge.online)?
Keel Row (Fastned) is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mermaid Car Park Blyth (evcharge.online)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mermaid Car Park Blyth (evcharge.online)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mermaid Car Park Blyth (evcharge.online)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.