# Newark And Sherwood Council Offices · evcharge.online

Web page: https://ampmap.co.uk/charger/evcharge-online-newark-and-sherwood-council-offices-uk

Newark And Sherwood Council Offices is an EV charging site in Newark on Trent, Nottinghamshire, run by evcharge.online. Both of its sockets are 22 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Great North Road, NG24 1BY
- **Area:** Newark on Trent, Nottinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.08079, -0.81371
- **Getting there:** Parking fees apply

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** £2.50/hour. Parking fees apply (from Open Charge Map)

## Site information

- **Operator:** evcharge.online
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** 2x 22kW Type 2 sockets on a single post located at the back of the building.

## Common questions

### How much does it cost to charge at Newark And Sherwood Council Offices (evcharge.online)?

The listed price is £2.50/hour. Parking fees apply. Prices can change, so check the price at the charger before you start.

### How fast is charging at Newark And Sherwood Council Offices (evcharge.online)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Newark And Sherwood Council Offices (evcharge.online) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Newark And Sherwood Council Offices?

Newark And Sherwood Council Offices is on the evcharge.online network.

### How long does a Tesla Model Y Long Range take to charge at Newark And Sherwood Council Offices (evcharge.online)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newark And Sherwood Council Offices (evcharge.online)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Newark And Sherwood Council Offices (evcharge.online)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newark on Trent](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/newark-on-trent)
- [Cheapest charging in Newark on Trent](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/newark-on-trent/cheapest)
- [evcharge.online chargers](https://ampmap.co.uk/networks/evcharge-online)

## Chargers near this site

- [Castle House Car Park · BP Pulse](https://ampmap.co.uk/charger/chargemaster-castle-house-uk) - CCS 50 kW · Castle House Car Park, Great North Road · From 89p/kWh
- [Shell Recharge EV Waitrose - Newark](https://ampmap.co.uk/charger/shell-recharge-ev-waitrose-newark-uk) - CCS / CHAdeMO 50 kW, Type 2 7 kW · Ossington Way, Newark · From 79p/kWh
- [Riverside Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-riverside-car-park-newark-uk) - Type 2 7 kW · Riverside Car Park, Tolney Lane · From 65p/kWh
- [Morrisons Newark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-newark-uk) - CHAdeMO 50 kW, Type 2 50 kW · Wm Morrison Supermarkets PLC
- [Maltings Retail Park, Newark · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-the-maltings-retail-park-uk) - CCS 150 kW · North Gate · From 89p/kWh
- [Newark, UK · Tesla](https://ampmap.co.uk/charger/tesla-newark-uk) - CCS 250 kW · N Gate · From 23p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evcharge-online-newark-and-sherwood-council-offices-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 11 Sept 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
