evcharge.online · EV charging site
St Davids Cross Hotel
Sgwâr y Groes, Saint Davids, SA62 6SP
St Davids Cross Hotel is an EV charging site in Saint Davids, Pembrokeshire, run by evcharge.online. All 4 of its sockets are 7 kW Type 2. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ffordd Angor / Anchor Drive (Dragon Charging), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.70/session+£0.70/kWh; other tariffs available(from Open Charge Map, 7 Dec 2022)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at St Davids Cross Hotel (evcharge.online)?
The listed price is £0.70/session+£0.70/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at St Davids Cross Hotel (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does St Davids Cross Hotel (evcharge.online) have?
4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates St Davids Cross Hotel?
St Davids Cross Hotel is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to St Davids Cross Hotel (evcharge.online)?
Ffordd Angor / Anchor Drive (Dragon Charging) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at St Davids Cross Hotel (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Davids Cross Hotel (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at St Davids Cross Hotel (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Quickwell Car Park, St Davids
- Oriel y Parc National Park visitors centre
- Ffordd Angor / Anchor Drive
- Penrhiw Hotel
- Caerfai Farm
- Solva Car Park, Solva
- Fastest nearby
- Ffordd Angor / Anchor Drive · 50 kW · 0.3 mi