# St Davids Cross Hotel · evcharge.online

Web page: https://ampmap.co.uk/charger/evcharge-online-st-davids-cross-hotel-uk

St Davids Cross Hotel is an EV charging site in Saint Davids, Pembrokeshire, run by evcharge.online. All 4 of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Sgwâr y Groes, SA62 6SP
- **Area:** Saint Davids, Pembrokeshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.88129, -5.26512

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** £0.70/session+£0.70/kWh; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** evcharge.online
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at St Davids Cross Hotel (evcharge.online)?

The listed price is £0.70/session+£0.70/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at St Davids Cross Hotel (evcharge.online)?

Up to 7 kW AC via Type 2.

### How many charging sockets does St Davids Cross Hotel (evcharge.online) have?

4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.

### Who operates St Davids Cross Hotel?

St Davids Cross Hotel is on the evcharge.online network.

### How long does a Tesla Model Y Long Range take to charge at St Davids Cross Hotel (evcharge.online)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Davids Cross Hotel (evcharge.online)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at St Davids Cross Hotel (evcharge.online)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Saint Davids](https://ampmap.co.uk/chargers/united-kingdom/pembrokeshire/saint-davids)
- [evcharge.online chargers](https://ampmap.co.uk/networks/evcharge-online)

## Chargers near this site

- [Quickwell Car Park, St Davids · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-quickwell-car-park-st-davids-uk) - Type 2 22 kW · St Davids
- [Oriel y Parc National Park visitors centre · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-oriel-y-parc-national-park-visitors-centre-uk) - Type 2 22 kW · Ffordd Caerfai
- [Ffordd Angor / Anchor Drive · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-ffordd-angor-anchor-drive-uk) - CCS 50 kW · Ffordd Angor / Anchor Drive
- [Penrhiw Hotel](https://ampmap.co.uk/charger/penrhiw-hotel-uk) - NACS 15 kW · Penrhiw
- [Caerfai Farm](https://ampmap.co.uk/charger/caerfai-farm-uk) - J-1772 7 kW, J-1772 4 kW · Ffordd Caerfai
- [Solva Car Park, Solva · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-solva-car-park-solva-uk) - Type 2 22 kW · Main Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evcharge-online-st-davids-cross-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
