evcharge.online · EV charging site
Staniland Car Park
Fydell Crescent, Boston, PE21 8SS
Staniland Car Park is an EV charging site in Boston, Lincolnshire, run by evcharge.online. All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.32/kWh. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lincolnshire Co-op Woodville Road Food Store (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.32/kWh(from Open Charge Map, 19 Sept 2021)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Staniland Car Park (evcharge.online)?
The listed price is £0.32/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Staniland Car Park (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Staniland Car Park (evcharge.online) have?
4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Staniland Car Park?
Staniland Car Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Staniland Car Park (evcharge.online)?
Lincolnshire Co-op Woodville Road Food Store (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Staniland Car Park (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Staniland Car Park (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Staniland Car Park (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Staniland
- West End
- Chalky Car Park
- Lincolnshire Co-op Woodville Road Food Store
- Co-op Skirbeck Road
- Cattle Market Units
- Cheapest nearby
- Lincolnshire Co-op Woodville Road Food Store · 89p per kWh · 50 kW · 0.5 mi
- Fastest nearby
- Lincolnshire Co-op Woodville Road Food Store · 50 kW · 0.5 mi