evcharge.online · EV charging site
Trentham Garden Centre
Stone Road, Stoke-on-Trent, ST4 8AX
Trentham Garden Centre is an EV charging site in Stoke-on-Trent, run by evcharge.online. All 4 of its sockets are 7 kW Type 2, and the price is listed as £2.50/hour. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Trentham, UK (Tesla), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £2.50/hour(from Open Charge Map, 27 Sept 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Trentham Garden Centre (evcharge.online)?
The listed price is £2.50/hour. Prices can change, so check the price at the charger before you start.
How fast is charging at Trentham Garden Centre (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Trentham Garden Centre (evcharge.online) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates Trentham Garden Centre?
Trentham Garden Centre is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Trentham Garden Centre (evcharge.online)?
Trentham, UK (Tesla) is 0.1 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Trentham Garden Centre (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trentham Garden Centre (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Trentham Garden Centre (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Trentham, UK
- High Tales (Stoke on Trent)
- Holiday Inn Stoke on Trent
- Longton Rugby Club
- Swift Service Station
- Harvester Trentham Lakes
- Cheapest nearby
- Trentham, UK · 68p per kWh · 250 kW · 0.1 mi
- Fastest nearby
- Swift Service Station · 300 kW · 1.7 mi