Evolt · EV charging site
346 Turing Way
346 Turing Way, Cambridge, CB3 1AF
346 Turing Way is an EV charging site in Cambridge, Cambridgeshire, run by Evolt. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.43/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Premier inn Cambridge North (Girton) (GeniePoint), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.43/kWh(from Open Charge Map, 27 Jan 2025)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 346 Turing Way (Evolt)?
The listed price is £0.43/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 346 Turing Way (Evolt)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does 346 Turing Way (Evolt) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates 346 Turing Way?
346 Turing Way is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to 346 Turing Way (Evolt)?
Premier inn Cambridge North (Girton) (GeniePoint) is 0.5 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 346 Turing Way (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 346 Turing Way (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 346 Turing Way (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Madingly Park & Ride 1
- Premier inn Cambridge North (Girton)
- Pod Point The Courtyard
- Pod Point Trinity Hall
- The Old Crown Inn
- The Red Bull, Newnham
- Cheapest nearby
- Pod Point The Courtyard · 30p per kWh · 7 kW · 0.8 mi
- Fastest nearby
- Premier inn Cambridge North (Girton) · 60 kW · 0.5 mi