# Back Lane Car Park Newtown · Evolt

Web page: https://ampmap.co.uk/charger/evolt-network-back-lane-car-park-newtown-uk

Back Lane Car Park Newtown is an EV charging site in Newtown, Sir Powys, run by Evolt. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Back Lane, SY16 2NH
- **Area:** Newtown, Sir Powys, United Kingdom
- **Coordinates (latitude, longitude):** 52.51500, -3.31760

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |
| Type 2 | 43 kW | 2 | Not listed |

- **Price:** £0.79/kWh. Parking fees apply (from Open Charge Map)

## Site information

- **Operator:** Evolt
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Back Lane Car Park Newtown (Evolt)?

The listed price is £0.79/kWh. Parking fees apply. Prices can change, so check the price at the charger before you start.

### How fast is charging at Back Lane Car Park Newtown (Evolt)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Back Lane Car Park Newtown (Evolt) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Back Lane Car Park Newtown?

Back Lane Car Park Newtown is on the Evolt network. For site issues, the operator lists +448082813508.

### How long does a Tesla Model Y Long Range take to charge at Back Lane Car Park Newtown (Evolt)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Back Lane Car Park Newtown (Evolt)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Back Lane Car Park Newtown (Evolt)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newtown](https://ampmap.co.uk/chargers/united-kingdom/sir-powys/newtown)
- [Evolt chargers](https://ampmap.co.uk/networks/evolt)

## Chargers near this site

- [Back Lane Car Park Newtown · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-back-lane-car-park-newtown-uk) - Type 2 22 kW · Back Lane
- [Pod Point Tesco Superstore - Newtown](https://ampmap.co.uk/charger/pod-point-tesco-superstore-newtown-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Pool Road · From 44.4p/kWh
- [The Old Vicarage · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-old-vicarage-uk) - Type 2 7 kW · Dolfor

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evolt-network-back-lane-car-park-newtown-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 26 Dec 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
