Evolt · EV charging site
Bank Street Car Park
Machynlleth, SY20 8DT
Bank Street Car Park is an EV charging site in Machynlleth, Sir Powys, run by Evolt. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as £0.49/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bank St Car Park Machynlleth (Evolt), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.49/kWh(from Open Charge Map, 29 Aug 2022)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bank Street Car Park (Evolt)?
The listed price is £0.49/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Bank Street Car Park (Evolt)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Bank Street Car Park (Evolt) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Bank Street Car Park?
Bank Street Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Bank Street Car Park (Evolt)?
Bank St Car Park Machynlleth (Evolt) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bank Street Car Park (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bank Street Car Park (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bank Street Car Park (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Maengwyn St Car Park
- Bank St Car Park Machynlleth
- Pod Point Machynlleth
- Centre for Alternative Technology
- Plas Talgarth Club Resort
- Cheapest nearby
- Pod Point Machynlleth · 45.6p per kWh · 7 kW · 0.3 mi