# Bank Street Car Park · Evolt

Web page: https://ampmap.co.uk/charger/evolt-network-bank-street-car-park-uk

Bank Street Car Park is an EV charging site in Machynlleth, Sir Powys, run by Evolt. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as £0.49/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Machynlleth, SY20 8DT
- **Area:** Machynlleth, Sir Powys, United Kingdom
- **Coordinates (latitude, longitude):** 52.58997, -3.85020

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** £0.49/kWh (from Open Charge Map)

## Site information

- **Operator:** Evolt
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Bank Street Car Park (Evolt)?

The listed price is £0.49/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bank Street Car Park (Evolt)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Bank Street Car Park (Evolt) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.

### Who operates Bank Street Car Park?

Bank Street Car Park is on the Evolt network. For site issues, the operator lists +448082813508.

### How long does a Tesla Model Y Long Range take to charge at Bank Street Car Park (Evolt)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bank Street Car Park (Evolt)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bank Street Car Park (Evolt)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Machynlleth](https://ampmap.co.uk/chargers/united-kingdom/sir-powys/machynlleth)
- [Evolt chargers](https://ampmap.co.uk/networks/evolt)

## Chargers near this site

- [Maengwyn St Car Park · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-maengwyn-st-car-park-uk) - Type 2 22 kW · Machynlleth
- [Bank St Car Park Machynlleth · Evolt](https://ampmap.co.uk/charger/evolt-network-bank-st-car-park-machynlleth-uk) - CHAdeMO 50 kW, Type 2 50 kW · Bank St
- [Pod Point Machynlleth](https://ampmap.co.uk/charger/pod-point-machynlleth-uk) - Type 2 7 kW · Heol Maengwyn · From 45.6p/kWh
- [Centre for Alternative Technology · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-centre-for-alternative-technology-uk) - Type 2 7 kW · Llwyngwern Quarry
- [Plas Talgarth Club Resort · Roam Charging](https://ampmap.co.uk/charger/roam-charging-plas-talgarth-club-resort-uk) - Type 2 22 kW · Pennal

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evolt-network-bank-street-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 Aug 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
