Evolt · EV charging site
Bottesford Car Park
Bottesford Road, Scunthorpe, DN16 3HA
Bottesford Car Park is an EV charging site in Scunthorpe, North Lincolnshire, run by Evolt. Both of its sockets are 22 kW Type 2. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Starbucks Ashby Road, Scunthorpe (Osprey Charging), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Price
- £0.34/kWh. Parking fees apply(from Open Charge Map, 7 Dec 2022)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bottesford Car Park (Evolt)?
The listed price is £0.34/kWh. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Bottesford Car Park (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does Bottesford Car Park (Evolt) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Bottesford Car Park?
Bottesford Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Bottesford Car Park (Evolt)?
Starbucks Ashby Road, Scunthorpe (Osprey Charging) is 0.9 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bottesford Car Park (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bottesford Car Park (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bottesford Car Park (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 11 Stow Road, Scunthorpe
- ubitricity Distributed Energy Systems UK Ltd. 297 Queensway
- ubitricity Distributed Energy Systems UK Ltd. 95 Warley Road
- ubitricity Distributed Energy Systems UK Ltd. Morley Road
- ubitricity Distributed Energy Systems UK Ltd. 44 Asterby Rd
- ubitricity Distributed Energy Systems UK Ltd. 99 Healey Road (parking lay by)
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 11 Stow Road, Scunthorpe · 45p per kWh · 5 kW · 0.4 mi