Evolt · EV charging site
Caffa Mill Car Park
Station Road, St Austell, PL23 1DF
Caffa Mill Car Park is an EV charging site in St Austell, Cornwall, run by Evolt. All 4 of its sockets are 7 kW Type 2, and the price is listed as 56p per kW. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Earl of Chatham - Cornwall (GeniePoint), 4.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Price
- 56p per kW(from Open Charge Map, 10 Jul 2024)
- Phone (from Open Charge Map)
- +448082813508
- Notes
- Octopus Juice card works too
- Getting there
- Parking must be paid 24/7
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Caffa Mill Car Park (Evolt)?
The listed price is 56p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at Caffa Mill Car Park (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does Caffa Mill Car Park (Evolt) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Caffa Mill Car Park?
Caffa Mill Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Caffa Mill Car Park (Evolt)?
Earl of Chatham - Cornwall (GeniePoint) is 4.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Caffa Mill Car Park (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Caffa Mill Car Park (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Caffa Mill Car Park (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Main Car Park
- Pod Point Fowey Hall Hotel - Luxury Family Hotels
- Pod Point Lovat Parks - Penmarlam Lodge Retreat
- St. Saviour's Hill Car Park
- Trenython Manor
- Cheapest nearby
- Pod Point Fowey Hall Hotel - Luxury Family Hotels · 49.2p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Pod Point Lovat Parks - Penmarlam Lodge Retreat · 22 kW · 0.6 mi