# Cairn Lodge Services · Evolt

Web page: https://ampmap.co.uk/charger/evolt-network-cairn-lodge-services-uk

Cairn Lodge Services is an EV charging site in Dalserf, South Lanarkshire, run by Evolt. All 6 of its sockets are 150 kW CCS, and the price is listed as £0.65/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Cairn Lodge Services, ML11 0RJ
- **Area:** Dalserf, South Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.58233, -3.82185

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 6 | Not listed |

- **Price:** £0.65/kWh (from Open Charge Map)

## Site information

- **Operator:** Evolt
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Cairn Lodge Services (Evolt)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Cairn Lodge Services (Evolt)?

Up to 150 kW DC via CCS.

### How many charging sockets does Cairn Lodge Services (Evolt) have?

6 charging sockets: 2 × 150 kW CCS, 2 × 150 kW CCS, 2 × 150 kW CCS.

### Who operates Cairn Lodge Services?

Cairn Lodge Services is on the Evolt network. For site issues, the operator lists +448082813508.

### How long does a Tesla Model Y Long Range take to charge at Cairn Lodge Services (Evolt)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cairn Lodge Services (Evolt)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Cairn Lodge Services (Evolt)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dalserf](https://ampmap.co.uk/chargers/united-kingdom/south-lanarkshire/dalserf)
- [Evolt chargers](https://ampmap.co.uk/networks/evolt)

## Chargers near this site

- [Braehead Car Park, Main Street, Douglas · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-braehead-car-park-main-street-douglas-uk) - Type 2 7 kW · Main Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evolt-network-cairn-lodge-services-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Jan 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.