# Central Middlesex Hospital · Evolt

Web page: https://ampmap.co.uk/charger/evolt-network-central-middlesex-hospital-uk

Central Middlesex Hospital is an EV charging site in Harlesden, Greater London, run by Evolt. Both of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Acton Lane, NW10 7N
- **Area:** Harlesden, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.53114, -0.26788

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** £0.30/kWh. Overstay of £10 after charging finishes (from Open Charge Map)

## Site information

- **Operator:** Evolt
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Central Middlesex Hospital (Evolt)?

The listed price is £0.30/kWh. Overstay of £10 after charging finishes. Prices can change, so check the price at the charger before you start.

### How fast is charging at Central Middlesex Hospital (Evolt)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Central Middlesex Hospital (Evolt) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Central Middlesex Hospital?

Central Middlesex Hospital is on the Evolt network. For site issues, the operator lists +448082813508.

### How long does a Tesla Model Y Long Range take to charge at Central Middlesex Hospital (Evolt)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Central Middlesex Hospital (Evolt)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Central Middlesex Hospital (Evolt)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Harlesden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/harlesden)
- [Cheapest charging in Harlesden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/harlesden/cheapest)
- [Evolt chargers](https://ampmap.co.uk/networks/evolt)

## Chargers near this site

- [Central Park · Total Energies](https://ampmap.co.uk/charger/total-energies-central-park-uk) - Type 2 7 kW · 43 Central Way
- [Barretts Green Road · Total Energies](https://ampmap.co.uk/charger/total-energies-barretts-green-road-uk) - Type 2 22 kW · 1 Barretts Green Road
- [ubitricity Distributed Energy Systems UK Ltd. 29 Harold Road, opp.](https://ampmap.co.uk/charger/ubitricity-29-harold-road-opp-uk) - Ubitricity · Type 2 5 kW · 29 Harold Road, opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 70 Wesley Avenue, opp.](https://ampmap.co.uk/charger/ubitricity-70-wesley-avenue-opp-uk) - Ubitricity · Type 2 5 kW · 70 Wesley Avenue, opp. · From 45p/kWh
- [Waxlow Road · Total Energies](https://ampmap.co.uk/charger/total-energies-waxlow-road-uk) - Type 2 22 kW · 10 Waxlow Road
- [Chase Road · Total Energies](https://ampmap.co.uk/charger/total-energies-chase-road-uk) - Type 2 22 kW, Type 2 7 kW · Chase Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evolt-network-central-middlesex-hospital-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 Mar 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
