Evolt · EV charging site
Church Street Car Park
Epworth, Scunthorpe, DN9 1ER
Church Street Car Park is an EV charging site in Scunthorpe, North Lincolnshire, run by Evolt. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is McDonald's - Gallagher Retail Park (InstaVolt Ltd), 6.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Getting there
- Front of Church Street Car Park in Epworth.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Church Street Car Park (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does Church Street Car Park (Evolt) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Church Street Car Park?
Church Street Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Church Street Car Park (Evolt)?
McDonald's - Gallagher Retail Park (InstaVolt Ltd) is 6.7 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Church Street Car Park (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Church Street Car Park (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Church Street Car Park (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 49 High St, Owston Ferry, · 56p per kWh · 5 kW · 2.9 mi