Evolt · EV charging site
Elphinstone Public Car Park
Madeira Road, Plymouth, PL1 2NU
Elphinstone Public Car Park is an EV charging site in Plymouth, run by Evolt. Both of its sockets are 7 kW Type 2. 42 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Exchange Street Car Park (Wenea), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Getting there
- Next to the toilet block,
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Elphinstone Public Car Park (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does Elphinstone Public Car Park (Evolt) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Elphinstone Public Car Park?
Elphinstone Public Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Elphinstone Public Car Park (Evolt)?
Exchange Street Car Park (Wenea) is 0.3 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Elphinstone Public Car Park (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Elphinstone Public Car Park (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Elphinstone Public Car Park (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- UK_PL_WHIMPLE_01 · 120 kW · 0.5 mi