Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Evolt · EV charging site

Green Lane Car Park

Green Lane, Derwen, LL21 0DD

Green Lane Car Park is an EV charging site in Derwen, Denbighshire, run by Evolt. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Instavolt Rhug Estates (InstaVolt Ltd), 1.7 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 10 Jul 2023Last verified 10 Jul 2023

Connectors

CCS · 50 kW2 connectors
CHAdeMO · 50 kW2 connectors
Type 2 · 22 kW8 connectors

Site information

Operator
Evolt
Opening hours
Not published
Access
Public
Price
DC: £0.79/kWh; AC: £0.35+£0.45/kWh(from Open Charge Map, 10 Jul 2023)
Phone (from Open Charge Map)
+448082813508

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Green Lane Car Park (Evolt)?

The listed price is DC: £0.79/kWh; AC: £0.35+£0.45/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Green Lane Car Park (Evolt)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Green Lane Car Park (Evolt) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.

Who operates Green Lane Car Park?

Green Lane Car Park is on the Evolt network. For site issues, the operator lists +448082813508.

Where is the nearest other charger with 50 kW or more to Green Lane Car Park (Evolt)?

Instavolt Rhug Estates (InstaVolt Ltd) is 1.7 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Green Lane Car Park (Evolt)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Green Lane Car Park (Evolt)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Green Lane Car Park (Evolt)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 10 Jul 2023

Amp Map does not take payment. You pay the operator.